Sudan

Sudan
The Republic of Sudan

Ministry of Investment 
Tel: (+249) 918 000 072
Fax: (+249) 183 787 192
Website: www.sudaninvest.org

Kassala Aroma Line Project

Part 1
  • Voltage : 220 kilovolt
  • Line length : 60 kilometres
  • Present situation : line has been identified
  • Implementation period : one year
  • Specifications : a 220 kilovolt double line on iron towers
  • Ground wires have two parts
  • Optical ground wire
  • Steel ground wire
  • Wire section area 24 sq. mm
Part 2
  • Construction of Aroma station
  • Type :conversion station with switches outside the station
  • Voltage : 220/ 110/ 33 kilovolts
  • Capacity 2 transformers with capacity 35 megavolt for each
  • Number of line entries and exits: 220 kilovolts = 05, 110 kilovolts = 05
  • Switch with switchboard – voltage: 33 kilovolt
  • Present situation : has been planned
  • Implementation period : one year
Capacity 75 megawatts
Contact National Electricity Corporation
Planning and Projects General Administration
Tel : +249 183782351
Fax : +249 183742403
Remarks The country with its vast natural resources, reasonable infrastructure and marked political stability has promulgated an investment legislation that offers a number of privileges and incentives. The business profit tax was reduced from 35% to 15% on the services sector, 10% on the industrial sector and 0% on the agricultural sector. In addition, these rather low rates are applied after one-year of the inception of the project. By allowing investors to freely repatriate their profits and import of capital goods free of custom duties, Sudan stands as an investment haven

Latest COMESA region news

Investment opportunities