Kassala Aroma Line Project

Part 1
  • Voltage : 220 kilovolt
  • Line length : 60 kilometres
  • Present situation : line has been identified
  • Implementation period : one year
  • Specifications : a 220 kilovolt double line on iron towers
  • Ground wires have two parts
  • Optical ground wire
  • Steel ground wire
  • Wire section area 24 sq. mm
Part 2
  • Construction of Aroma station
  • Type :conversion station with switches outside the station
  • Voltage : 220/ 110/ 33 kilovolts
  • Capacity 2 transformers with capacity 35 megavolt for each
  • Number of line entries and exits: 220 kilovolts = 05, 110 kilovolts = 05
  • Switch with switchboard – voltage: 33 kilovolt
  • Present situation : has been planned
  • Implementation period : one year
Capacity 75 megawatts
Contact National Electricity Corporation
Planning and Projects General Administration
Tel : +249 183782351
Fax : +249 183742403
Remarks The country with its vast natural resources, reasonable infrastructure and marked political stability has promulgated an investment legislation that offers a number of privileges and incentives. The business profit tax was reduced from 35% to 15% on the services sector, 10% on the industrial sector and 0% on the agricultural sector. In addition, these rather low rates are applied after one-year of the inception of the project. By allowing investors to freely repatriate their profits and import of capital goods free of custom duties, Sudan stands as an investment haven