Investment opportunities

Kalugi – Talodi – Kadugli Line Project

Kalugi/ Talodi/ Kadugli Line Project (Part 1)
  • Voltage :220 kilovolt
  • Line length : 145 kilometres
  • Present situation : Line has been identified
  • Implementation period : one year
  • Specifications : a 220 kilovolt double line on iron towers
  • Ground wires have two parts
  • Optical ground wire
  • Steel ground wire
  • Wire section area 240 sq. mm
Kalugi/ Talodi/ Kadugli Line Project – Construction of two substations (Part 2) Taludi substation
  • Type : conversion station with switches outside the station
  • Voltage : 220 /33/ 11 kilovolt
  • Capacity : two transformers with 40 megawatt capacity for each
  • Number of line entries and exits : 220 kilovolts = 7
  • Switch with switchboard – voltage: 33 kilovolt
  • Switch with switchboard – voltage: 11 kilovolt
Kalugi substation
  • Type : conversion station with switches outside the station
  • Voltage : 220/ 33/ 11 kilovolt
  • Capacity 2 transformers with capacity 40 megavolt for each
  • Number of line entries exits: 220 kilovolt = 7, 110 kilovolt = 5
  • Switch with switchboard – voltage: 33 kilovolt
  • Switch with switchboard – voltage 11 kilovolt
  • Present situation : has been planned
  • Implementation period : one year
Contact National Electricity Corporation
Planning and Projects General Administration
Tel : +249 183782351
Fax : +249 183742403
Remarks The country with its vast natural resources, reasonable infrastructure and marked political stability has promulgated an investment legislation that offers a number of privileges and incentives. The business profit tax was reduced from 35% to 15% on the services sector, 10% on the industrial sector and 0% on the agricultural sector. In addition, these rather low rates are applied after one-year of the inception of the project. By allowing investors to freely repatriate their profits and import of capital goods free of custom duties, Sudan stands as an investment haven.